|
Build Your Online Product Catalogs?
Product Name: |
Hot DIP Galvanized Round Carbon Steel Tube
|
Supply Ability: |
400,000 tons/year |
Related proudcts |
steel pipe, round steel pipe, hdg steel pipe, |
Specifications |
(1.2-6)*(20-600)*length |
Price Term: |
FOB |
Port of loading: |
Tianjin |
Minimum Order |
15 tons |
Unit Price: |
430 USD/TON |
|
thickness 1.2mm-6mm Diameter 20mm-150mm material Q235&©|160;&©|160;SS400, etc pipe section round Zinc 220 standard ASTM GB DIN&©|160;&©|160;JIS steel type carbon structural term FOB CIF CFR Package Seaworthy export package
&©|160;&©|160;&©|160;&©|160;&©|160;&©|160;Thickness: 1.2mm-4.0mm; &©|160;&©|160;&©|160;&©|160;&©|160;&©|160;Diameter: 20mm-150mm; &©|160;&©|160;&©|160;&©|160;&©|160;&©|160;Length: 5.8 m, 6m or on the&©|160;random; &©|160;&©|160;&©|160;&©|160;&©|160;&©|160;Material: Q235, Q235B, SS400, ASTM A36, etc; &©|160;&©|160;&©|160;&©|160;&©|160;&©|160;Pipe section: Round; &©|160;&©|160;&©|160;&©|160;&©|160;&©|160;Zinc coated: 220 &©|160;&©|160;&©|160;&©|160;&©|160;&©|160;Technique:&©|160;ERW Hot&©|160;Rolled &&©|160;Galvanized&©|160;Steel&©|160;Material; &©|160;&©|160;&©|160;&©|160;&©|160;&©|160;Standard:&©|160;&©|160;GB, ASTM, DIN, JIS, AISI, BS; &©|160;&©|160;&©|160;&©|160;&©|160;&©|160;Steel Type:&©|160;Carbon Structural Steel &©|160;&©|160;&©|160;&©|160;&©|160;&©|160;Forming:&©|160;Hot&©|160;Rolled&©|160;Steel; &©|160;&©|160;&©|160;&©|160;&©|160;&©|160;Trade term: FOB, CFR, CIF. &©|160;&©|160;&©|160;&©|160;&©|160;&©|160;Payment term: T/T, L/C at sight; &©|160;&©|160;&©|160;&©|160;&©|160;&©|160;Package: Seaworthy export package
&©|160;&©|160;&©|160;&©|160; Our co***ny unique advantage are: 1.Popular and trustworthy supplier of domestic international trade co***ny 2. Strategic location: Our factory is next to Tianjin Xingang port. 3. Industrial product expertise team. 4. Product reliability, experienced OEM, competitive price, and on-time delivery. 5. On-time feedback and communication. 6. Business belief: Credit First, Be Honesty, Mutual Benefit and Customer Supremacy.
FAQ Q: What about your payment term? A: Usually T/T or L/C, 30% deposit and 70% before delivery. &©|160; Q: What about your standard delivery date ? A: Within 15-25 days after receiving your deposit. &©|160; Q: How about your capacity? A: For steel pipes, 400,000 tons per year.&©|160;&©|160;For steel plate, 60,000 tons per year. For steel coil is 750000 tons per year. &©|160; Q: What about |
Company: |
Tianjin Shangde Rongcheng International Co., Ltd
|
Contact: |
Mr. Jack Chang |
Address: |
Room 502, Xingpin Building, Linke East Road, Hedong District, Tianjin, China |
Postcode: |
300384 |
Tel: |
+8615102263507 |
Fax: |
+862258889282 |
E-mail: |
|
|
|
|